Tupolev Tu-125

17,7 k imgage of 125 R-15B-300 "O" variant
plan view

The draft was initiated after deriving the requirements to Tu-22 successor. S.M.Yeger's department of Tupolev Bureau was responsible of it. Preliminary calculations had shown that the necessary parameters may be achieved in the case of providing supersonic drag to lift ratio not less than 6 and subsonic one not less than 12. As soon as the flight would to take place under very severe conditions: high temperature and high air flow loads obviously used materials couldn't been used. Titanium and steel structure elements had been planned. The work on this project continued until the mid of 60th just to the moment when military men rejected the tactics of high altitude supersonic attack. It's interesting that this plane was under developement parallely with 1/3 lighter "135" bomber which was to have the similar shapes. There exist an opinion that these works caused the appearing of Sukhoy T-4 bomber as a competitor.

90,7k Tu-125 model image


References:
  • Samoylovich O.S. Aside Sukhoy.Moscow, "Ot vinta"edition, ISBN 5-7656-0098-0
  • Aviatsiya i Kosmonavtika N9 1999, pp48-49
  • Technical information
    Type "125"
    Function
    long range
    supersonic bomber
    Year 1958
    Crew ?
    Engines
    4xR-15B-300
    4x24000kg
    Length 41,1m
    Wingspan 22,2m
    Wing area 226m
    Supersonic
    cruise
    speed
    3500km/h
    Takeoff mass 110000kg
    Range
    supersonic
    4800km
    Ceiling
    over target
    25000m
    Armament
    Rockets one X-22 missile
    Created November 8, 1999
    by Sergey Andreev;